The Les Mées plant is located in the municipality of Les Mées in the Provence Alpes Cote d’Azur region. Its installed capacity amounts to 10.1 MWp and and the electricity produced is connected to the local EDF distribution grid.
PV Modules: 43,400 Yingly (multicristaline c-Si). Inverters : SMA. Technology: Fixed Tilt. Ground mounted. Annual Avoided Emissions: 7,578 Metric Tons CO2. Household Supply: 4,766 homes.
PPA System : 20-year PPA under French FiT (Tariff Order March 2011). System size : 10.1 MWp. Start construction date : June 2011. Commissioning date (est) : June 2012. EPC Contractor : Würth. O&M Provider : Würth. Land: 17 Hectares.